Home > Waste Water > PICA completes a successful inspection of 12″ FM in Midwest

PICA completes a successful inspection of 12″ FM in Midwest

November 26, 2012 Leave a comment Go to comments

PICA crew with 12-in SeeSnakePICA was recently entrusted with the responsibility of inspecting 3,000 ft of ductile iron force main for a client on the banks of Lake Michigan. This critical pipeline carries treated wastewater between two plants and was targeted for inspection due to a failure on a parallel pipeline.

To facilitate this inspection, PICA inserted their free-swimming 12″ SeeSnake tool into the line by way of a launch barrel, used the plant’s pumps to push the tool the entire distance, and received it in a catch barrel. To ensure the tool would successfully navigate the pipeline, a gauge pig was run prior to inspection. Calibrations runs were also conducted on site to ensure the best possible data would be collected.

After three days of field work, the PICA team demobilized and sent the data to Toronto where it is currently being analysed.

For more information about this job, contact PICA USA at 1.704.236.3771.

Advertisements
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: